Skip to main content
Editing Step 13 —

Step Type:

Drag to rearrange

Insert four M3 x 35 screws into the indicated holes

Slide on four 25 mm spacers onto screws

attach the LCD ribbon cables to the LCD panel with both pink lines to the left as shown in picture

Place the display onto the screws, with the knob towards the right side, and tighten four M3 hexnut nylocks onto the screws

Your contributions are licensed under the open source Creative Commons license.