Skip to main content

Changes to Step #1

Edit by Dan Royer

Edit approved by Dan Royer

Before
After
Unchanged

Step Lines

[title] Window setup
[* 1] Insert the suction cups: 3 in each triangular corner, and 2 in each of the control boards.
[* 1] wet the suction cups before pressing the components to the top of the glass. Try to get the motors at the same height and as level as possible. The electronics must go between the motors.
[* 1] arrange the cables so that no cables hang down in the drawing area of the machine. The drawing area is the area under and between the two motors. Some droop at the top is OK.
-[* 1] Proceed to Pen Holder setup.
+[* 1] Proceed to Counterweight & belt setup