Changes to Step #23
Step Lines
+ | [title] Picasso Box - Finishing Touches |
---|---|
+ | [* 10] ***Prepare the following parts:*** |
+ | [* 1] Picasso Acrylic Cover Plates (x2) |
+ | [* 1] 6D Hand Face |
+ | [* 1] M2x6mm Screws (x6) |
+ | [* 1] M3x10mm Screws (x3) |
+ | [* 1] M3 Square Nuts (x4) |
+ | [* 1] Screw the Acrylic plates to Top AND Bottom of Picasso Box with M2 Screws |
+ | [* 1] Insert the Square Nuts in the Nut insert on the side of the Hand Face part and secure the hand face to the hand Gearbox output using M3 Screws |