Skip to main content

Changes to Step #31

Edit by Dan Royer

Edit approved by Dan Royer

Before
After
Unchanged

Step Lines

[title] Final Cable Assembly - M0-2 Power Cable
-[* 2] Start with M0 cables from the GX16 Aviation Plug and the screw terminal that's directly connected to PSU.
- [* 10] Start with Black, Green, Red, White
-[* 3] Repeat the same process for M1 and M2 as shown in the second picture.
+[* 2] Start with ***M0 cables*** from the GX16 Aviation Plug and the screw terminal that's directly connected to PSU.
+ [* 10] Start with ++Black, Green, Red, White++
+[* 3] ++Repeat++ the same process for M1 and M2 as shown in the second picture.