[title] Power Supply Installation - Rocker Switch Test | |
[* 2] Secure the ***Power Cable*** to the PSU Screw Terminals | |
[* 3] ++Test the Rocker Switch and PSU++ by connecting the Power Plug and turning the Switch ON | |
+ | [* 9] Be careful to NOT touch the screw terminals with your bare hands. |
[* 5] If the Green LED light turns on, it's a good sign | |
[* 8] Use the Multimeter to make sure the output voltage is ***approximately 24V***, adjust using the Philip Head Screw | |
[* 6] Left 3 terminals are Positive Output | |
[* 7] Middle 3 terminals are Ground/Negative Output | |
- | [* |
+ | [* 1] Once test is successful, ***Turn off ***the Power using the Switch and ***unplug*** the Power Plug |