Changes to Step #10
Step Lines
[title] Power Supply Installation - Rocker Switch Test | |
- | [* 2] Secure the |
- | [* 3] Test the Rocker Switch and PSU by connecting the Power Plug and turning the Switch |
+ | [* 2] Secure the ***Power Cable*** to the PSU Screw Terminals |
+ | [* 3] ++Test the Rocker Switch and PSU++ by connecting the Power Plug and turning the Switch ON |
[* 5] If the Green LED light turns on, it's a good sign | |
[* 8] Use the Multimeter to make sure the output voltage is ***approximately 24V***, adjust using the Philip Head Screw | |
[* 6] Left 3 terminals are Positive Output | |
[* 7] Middle 3 terminals are Ground/Negative Output | |
- | [* 9] Once test is successful, ***Turn off ***the Power using the Switch and unplug the Power Plug |
+ | [* 9] Once test is successful, ***Turn off ***the Power using the Switch and ***unplug*** the Power Plug |