Skip to main content

Changes to Step #10

Edit by Dan Royer

Edit approved by Dan Royer

Before
After
Unchanged

Step Lines

[title] Power Supply Installation - Rocker Switch Test
-[* 2] Secure the power cable wires in the PSU Screw Terminals
-[* 3] Test the Rocker Switch and PSU by connecting the Power Plug and turning the Switch on
+[* 2] Secure the ***Power Cable*** to the PSU Screw Terminals
+[* 3] ++Test the Rocker Switch and PSU++ by connecting the Power Plug and turning the Switch ON
[* 5] If the Green LED light turns on, it's a good sign
[* 8] Use the Multimeter to make sure the output voltage is ***approximately 24V***, adjust using the Philip Head Screw
[* 6] Left 3 terminals are Positive Output
[* 7] Middle 3 terminals are Ground/Negative Output
-[* 9] Once test is successful, ***Turn off ***the Power using the Switch and unplug the Power Plug
+[* 9] Once test is successful, ***Turn off ***the Power using the Switch and ***unplug*** the Power Plug