Changes to Step #10
Step Lines
+ | [title] Power Supply Installation - Rocker Switch Test |
---|---|
+ | [* 2] Secure the power cable wires in the PSU Screw Terminals |
+ | [* 3] Test the Rocker Switch and PSU by connecting the Power Plug and turning the Switch on |
+ | [* 5] If the Green LED light turns on, it's a good sign |
+ | [* 8] Use the Multimeter to make sure the output voltage is ***approximately 24V***, adjust using the Philip Head Screw |
+ | [* 6] Left 3 terminals are Positive Output |
+ | [* 7] Middle 3 terminals are Ground/Negative Output |
+ | [* 9] Once test is successful, ***Turn off ***the Power using the Switch and unplug the Power Plug |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added